MEMPERCEPAT USIA PROYEK MENGGUNAKAN METODE PERT DAN CPM UNTUK PENGEMBANGAN SISTEM APLIKASI KOMPUTER

Rachmat Adi Purnama

Abstract


At the time a development project application systems are often responsible for the project
constraints of time needed to complete the project itself, where the time is set based on the approximate
duration of each activity that must be done according to the plan changes from manejement. Based on
the problems, then a solution is required to determine the activities which can be complete. The
purpose of writing this journal is to provide a solution in overcoming the problems associated with the
acceleration time of a project application development system, while the purpose of writing this
journal is to apply methods of PERT and CPM in the age of speed or time required in completing a
project according to the age plan (UREN). Research methods that do the authors use the method of
study literature, and descriptive method by using the table-table operational variables. At the end of
the discussion of the results will be described how the age estimates (UPER) can be adjusted to the age
of the plan (UREN) long with a new activity, so that the responsible project can implement the project
in accordance with the target time is planned by management
Keys : PERT, CPM, UPER, UREN


Full Text:

PDF

References


Heizer,Jay.& Barry Render, .2005. Manajemen

Operasi.,Jakarta: Salemba Empat.

Indriantoro, Nur dan Supomo Bambang. 2002,.

Metodologi Penelitian Bisnis untuk Akuntansi

dan Manajemen, Edisi pertama. Yogyakarta:

BPFE

Maharesi, Retno. 2002 . Penjadwalan Proyek

Dengan Menggabungkan Metode PERT dan

CPM. Depok: Universitas Gunadarma.

[Http:/repository.gunadarma.ac.id:8000/A51-

_Retno_Maharesi_154.pdf, Tgl akses

/07/2009 pukul 10:52]

Meridith J.R., Mantel SJ, Jr. 2002. Project

Management A Managerial Approach, Fourth

Editions. USA: John Willey & Sons, Inc

Purnama, Rachmat Adi. 1998. Manajemen Proyek.

Jakarta:AMIK BSI.

Rostianingsih, Silvia. 2006. Pembuatan Aplikasi

Manajemen Proyek Dalam Mengelola Proyek di

PT. X.. Depok:Universitas Gunadarma.

[http://repository.gunadarma.ac.id:8000/209//

Tgl akses 23/07/2009 pukul 09:42]

Schoeder, Roger. 2002. Manajemen Operas., Jakarta:

Erlangga.

Soeharto, Iman. 2002. Studi Kelayakan Proyek

Industri. Jakarta: Erlangga.

Subagyo, Pangestu. 2000. Dasar-dasar Operations

Research. Yogyakarta:BPFE.

Tubagus, Ali Haedar. 1997. Prinsip-prinsip Network

Planning. Jakarta:PT Gramedia.Yogyakarta:BPFE.




DOI: https://doi.org/10.31294/p.v11i3.4737

Copyright (c) 2009 Rachmat Adi Purnama

Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

ISSN2579-3500

Dipublikasikan oleh LPPM Universitas Bina Sarana Informatika

Jl. Kramat Raya No.98, Kwitang, Kec. Senen, Kota Jakarta Pusat, DKI Jakarta 10450
Telepon: 021-21231170, ext. 704 / 705
Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License
https://jpc.unik-kediri.ac.id/slot-pulsa/ http://cbtdikpora2.bantulkab.go.id/slot-maxwin/ https://kotasehat.depok.go.id/-/slot-pulsa/ https://kotasehat.depok.go.id/-/slot-gacor/ https://kotasehat.depok.go.id/-/slot-gopay/ https://smkppnmataram.distanbun.ntbprov.go.id/-/slot-kamboja/ https://smkppnmataram.distanbun.ntbprov.go.id/-/slot-deposit-pulsa/ https://ebphtb.karimunkab.go.id/log/slot4d/ https://ebphtb.karimunkab.go.id/log/bandar-togel/ http://conference.fortei.unp.ac.id/public/slot-dana/ http://conference.fortei.unp.ac.id/public/slot88/ https://diskop.ntbprov.go.id/.tmb/slot-pulsa/ https://diskop.ntbprov.go.id/.tmb/slot-hoki/ https://simasn.malutprov.go.id/vendor/slot-bonus/ https://simasn.malutprov.go.id/vendor/slot-thailand/ https://asnunggul.lan.go.id/assets/components/components1/ https://asnunggul.lan.go.id/assets/components/components2/ sundaempire787 Poskobet