Sistem Informasi Manajemen Penentuan Standar Waktu Kerja Metode Time Study Berbasis Web (Studi Kasus PT Eka Sandang Duta Prima)

Roymon Panjaitan, Myra Andriana, Tantik Sumarlin

Abstract


Determination of the number of workers, costs, and working time into a standard measure of the working time of a product. Time efficiency and production reports become complex issues of the importance of production timeliness. The purpose of this study is to provide a design of an information system for determining working time standards that can be accessed integrated into a more efficient report form. Methods used with research and development where data collected from observations, interviews from case studies in the field. Determination of uptime standards using time study methods developed into web-based information systems using PHP programming languages with MySQL databases. The results of the design of this study, first contribute to obtain information that can help the management in determining management policy decisions. Second, fast and accurate determination of working time standards can provide customers with answers about price and fast uptime. Third, calculating the standard time of completion of work helps to choose the best alternative working method with the principles and techniques of work measurement at PT Eka Sandang Duta Prima.       


Full Text:

PDF (63-77)

References


A.S. Rosa, M. S. (2015). Aplikasi Pemograman Web Dinamis dengan PHP dan MySQL. Sistem Informasi Lelang Online Kendaraan Salvage Berbasis Web Dengan Fitur SMS Gateway Pada Balai Lelang Astria Palembang.

Abdurahman, M., Safi, M., & Abdullah, M. H. (2018). Sistem Informasi Pengolahan Data Balita Berbasis Website Pada Kantor UPT-KB Kec. Ternate Selatan. IJIS - Indonesian Journal On Information System, 3(2). https://doi.org/10.36549/ijis.v3i2.46

Afiani, R., & Pujotomo, D. (2017). Penentuan Waktu Baku Dengan Metode Stopwatch Time Study Studi Kasus Cv . Mans Group. Jurusan Teknik Industri, 6(3).

Ahmad, L. (2018). Sistem Informasi Manajemen: Buku Referensi: Sistem Informasi Manajemen (Vol. 1). KITA Publisher.

Dick, W., Carey, L., & Carey, J. O. (2005). The systematic design of instruction.

Fitriani, E. N., & Suprapti, S. (2021). Analisis Produktivitas Pekerjaan Prefabricated Vertical Drain Menggunakan Metode Time Study. Konstruksia, 12(1). https://doi.org/10.24853/jk.12.1.27-34

Handoko, T. H. (2016). Manajemen personalia dan sumberdaya manusia. BPFE.

Hasibuan, M. S. P., & Hasibuan, H. M. S. P. (2016). Manajemen sumber daya manusia. Bumi Aksara.

Irfan Koko Ardian, Kristanto Mulyono, & Susiyanti Nurjanah. (2020). Analisis Waktu Standar Pembuatan Fitting Elbow PVC D 2 Inch Dengan Metode Stopwatch Time Study. JENIUS : Jurnal Terapan Teknik Industri, 1(2). https://doi.org/10.37373/jenius.v1i2.57

Mariawati, A. S. (2019). Pengukuran Waktu Baku Pelauyanan Obat Bebas Pada Pekerjaan Kefarmasian di Apotek CT. Journal Industrial Servicess, 5(1). https://doi.org/10.36055/jiss.v5i1.6491

Miranda, S., & Tripiawan, W. (2019). Perbandingan Penentuan Waktu Baku Menggunakan Metode Time Study dan Critical Path Method (CPM). Jurnal Sistem Dan Manajemen Industri, 3(1). https://doi.org/10.30656/jsmi.v3i1.1418

Muluk, R. K. A. (2019). Penentuan Waktu Baku Dalam Pembuatan Kotak Alat Pembaca Pembaca Melalui Motion Study. Sainteks: Jurnal Sains Dan Teknik, 1(1). https://doi.org/10.37577/sainteks.v1i1.111

Natalia, M., Adibroto, F., & Lubis, R. (2020). Perbandingan Produktivitas Tenaga Kerja Dengan Metode Time Study Terhadap AHSP SNI 2016. Siklus : Jurnal Teknik Sipil, 6(2). https://doi.org/10.31849/siklus.v6i2.4749

Nurjanah, N., & Ba’tha, N. R. (2020). Analisis Penentuan Waktu Satandar Pada Proses Outbond Bagasi di PT Angkasa Pura II. Jurnal Logistik Bisnis. https://doi.org/10.46369/logistik.v10i1.693

Pawiro, S., Tjakra, J., & Arsjad, T. T. (2015). Optimalisasi Produktivitas Tenaga Kerja dalam Proyek Konstruksi (Studi Kasus: Pembangunan Gedung Mantos Tahap III). Tekno, 13(62).

Pengukuran Waktu Baku, P., Charoonsri Rizani, N., Mardi Safitri, D., & Ayu Wulandari, P. (2012). Perbandingan Pengukuran Waktu Baku Dengan Metode Stopwatch Time Study dan Metode Ready Work Factor (RWF) Pada Department Hand Insert PT. Sharp Indonesia. In JURNAL TEKNIK INDUSTRI (Vol. 2, Issue 2).

Rambough, O. M. T., Booch, O. M. T., & Jacobson, O. (1991). Object Modeling Technique.

Rully, T., & Rahmawati, N. T. (2015). Perencanaan Pengukuran Kerja Dalam Menentukan Waktu Standar Dengan Metode Time Study Guna Meningkatkan Produktivitas Kerja Pada Divisi Pompa Minyak PT Bukaka Teknik Utama TBK. JIMFE (Jurnal Ilmiah Manajemen Fakultas Ekonomi), 1(1). https://doi.org/10.34203/jimfe.v1i1.442

Sandi, C. K., & Cahyono, N. (2020). Analisis Produktivitas Pekerja Dengan Metode Time Study Pada Pekerjaan Kolom (Studi Kasus Proyek Rehabilitasi Pasar Johar Kota Semarang). Jurnal Teknik Sipil Giratory Upgris, 1(1).

SRosa, A., & Shalahuddin, M. (2014). Rekayasa Perangkat Lunak Struktur dan Berorientasi Objek. Bandung: Informatika. Gambar, 15.

Sudiro, A., Rahadian, P., & Prima, N. (2011). Sistem Informasi Manajemen. Universitas Brawijaya Press.

Suryadi, A. (2020). Perancangan Sistem Informasi Manajemen Kegiatan Sivitas Akademika Universitas Terbuka. SISTEMASI, 9(1). https://doi.org/10.32520/stmsi.v9i1.604

Sutaarga, O., & Setiawan, A. (2021). Penentuan Waktu Baku Dalam Pengecekan Bonding Sampel Sepatu pada PT. Ching Luh Indonesia. Journal Industrial Manufacturing, 6(1). https://doi.org/10.31000/jim.v6i1.4115

Sutabri, T. (2015). “Analisis Sistem Informasi.”

Taufiq, R. (2013). Sistem Informasi Manajemen: Konsep Dasar. Analisis Dan Metode Pengembangan, Graha Ilmu.

Trisiany, E. M., & Halim, E. (2006). Analisa Nilai Perbandingan Produktivitas Tenaga Kerja dengan Menggunakan Metode Standard dan Aktual (Studi Kasus Proyek X dan Y). Skripsi, Universitas Kristen Petra, Surabaya.

Wignjosoebroto, S. (1995). Ergonomi Studi Gerak dan Waktu: Teknik Analisis untuk Peningkatan Produktivitas Kerja.

Yakub. (2014). Pengantar Sistem Informasi. Igarss 2014. https://doi.org/10.1007/s13398-014-0173-7.2




DOI: https://doi.org/10.31294/evolusi.v9i2.11158

ISSN: 2657-0793 (online). ISSN: 2338-8161 (print)

Published By LPPM Universitas Bina Sarana Informatika

Jl. Kramat Raya No.98, Kwitang, Kec. Senen, Kota Jakarta Pusat, DKI Jakarta 10450
Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License